Page 2 of 2 FirstFirst 12
Results 11 to 14 of 14

Thread: carpet template

  1. #11
    VCVC Member krappy's Avatar
    Join Date
    Apr 2005
    Location
    swansboro NC
    Posts
    225
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)

    ha! i thought that vaporized...that might be mine from eons ago!

    Quote Originally Posted by van-itti View Post
    IIRC i used pieces of 3/8" plywood, and made the fit, then used another as a backing.
    had to go in diagonally to make the door, but it did eventually lay down as one piece!
    Last edited by krappy; 02-08-2020 at 12:43 PM.

  2. #12
    VCVC Member krappy's Avatar
    Join Date
    Apr 2005
    Location
    swansboro NC
    Posts
    225
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    also, since i had converted to propane, you notice there is no cutout

    for the gas filler tunnel

    so keep that in mind when you are working out your cuts

    k

  3. #13
    VCVC Member SAVAGE's Avatar
    Join Date
    Feb 2004
    Location
    FT. WAYNE IN.U.S.A.
    Posts
    3,220
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    You still got a pic of the wood floor you did K ??
    Tom

  4. #14
    VCVC Member krappy's Avatar
    Join Date
    Apr 2005
    Location
    swansboro NC
    Posts
    225
    Mentioned
    0 Post(s)
    Tagged
    0 Thread(s)
    Tom, unfortunately all those pictures were posted on

    VCVC2 and are currently only available to NSA connected

    folks. i looked through an archive i had, but i had a

    “mad deleting fit”...trying to save space...too bad

User Tag List

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •